Executes installation (or installation supervision) and commissioning works.

On-site project implementation.


Installation Works: Executed by certified contractors (or our in-house specialists) in strict accordance with the approved engineering design. This includes equipment mounting, cable laying, and connection to facility utilities and grounding systems.

Installation Supervision: If the installation is carried out by a third-party contractor or the customer's own personnel, engineers from IIT AZIYA EVNAT provide comprehensive technical oversight. This involves verifying installation accuracy at every stage, briefing the installation crew, and cross-checking the physical build against the engineering documentation.

Commissioning & Start-Up:

  • Pre-commissioning: Power-up procedures, loop checks, and step-by-step energization of system components.

  • System Configuration: Parameterization of controllers and measurement channels.

  • Calibration: On-site calibration and adjustment of the CSQC-EVNAT measurement systems using actual process media.

Site Acceptance Testing (SAT): Comprehensive system trials under operational load, including the validation of control logic and safety interlock algorithms.